Pages

Wednesday 14 October 2009

My Repair Project 2

Continue from the previous one http://johnmax89.blogspot.com/2009/10/my-repair-project.html
I posted the project in half way because it was weekend so I can't my project done until I back to MAS. So here are the continue to the back of the project.

Covered with resin and sand for flushing

The adhesive film and plies

The system reading from my project

The whole system view

My project was being vacuumed, pretty amazing with vacuum 24"

After unpacking, this is my result, which is delamination. Because of pre-pry. @^#%&^@ is ok it had been justify by the man in-charge. lol


Here is the video showing the dwelling period

No comments:

Post a Comment

Powered By Blogger